
3
• Install a lightning arrester at the input end of the power supply.
Installation accessories and tools
Figure 1 and Figure 2 list the accessories and tools required for installing the router.
Figure 1 Installation accessories
NOTE:
The type of the antenna that comes with the router depends on the router model.
Figure 2 User-supplied tools and equipment
Pre-installation checklist
Item Re
uirements Yes No
Installation
site
Ventilation
• There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
• The installation site ventilation system is adequate.
Comentários a estes Manuais