H3C S3100V2 Switch Series Installation Guide Hangzhou H3C Technologies Co., Ltd. http://www.h3c.com Document version: 6W1
4 S3100V2-26TP-PWR-EI Front panel Figure 7 S3100V2-26TP-PWR-EI front panel (1) 10/100Base-TX Ethernet port (2) 10/100Base-TX Ethernet port LEDs (le
5 S3100V2-16TP-PWR-EI Front panel Figure 9 S3100V2-16TP-PWR-EI front panel (1) 10/100Base-TX Ethernet port (2) 10/100Base-TX Ethernet port LEDs (le
6 S3100V2-8TP-PWR-EI Front panel Figure 11 S3100V2-8TP-PWR-EI front panel (1) 10/100Base-TX Ethernet port (2) 10/100Base-TX Ethernet port LEDs (lef
7 Figure 13 S3100V2-8TP-PWR-EI right side panel 1 (1) Security lock slot
8 Preparing for installation Safety recommendations To avoid possible bodily injury and equipment damage, read the safety recommendations in this cha
9 Figure 14 Use an ESD-preventive wrist strap 1 (1) Rack post Safety with laser The S3100V2 Switch Series is a line of class 1 laser products. When
10 Table 3 Humidity requirements Humidity Range Operating humidity (noncondensing) 10% to 95% Storage humidity (noncondensing) 5% to 95% Lasting h
11 • Keep the switch far away from high-power radio launchers, radars, and equipment with high frequency or high current. • Use electromagnetic shi
12 Installation tools Table 6 Tool list Category Tool Measuring and marking tools Long tape, ruler of 1 m (3.28 ft), gradienter, marker, chalk line,
13 Installing the switch CAUTION: Keep the tamper-proof seal on a mounting screw on the chassis cover intact, and if you want to open thechassis, c
Copyright © 2011, Hangzhou H3C Technologies Co., Ltd. and its licensors All rights reserved No part of this manual may be reproduced or transmitted
14 Table 7 S3100V2 Switch Series installation methods Switch model Installation methods Installation accessories 1. Installing the switch into the
15 Figure 17 Front mounting brackets (1) Screw hole (for M6 screw) for fixing the front mounting bracket to the rack (2) Screw hole for fixing the f
16 Slide rails When installing the switch into a 19-in rack, you can use slide rails to support the switch. Figure 19 Slide rail appearance (1) Slo
17 Figure 21 Mounting bracket for wall mounting 123 (1) Screw hole (M6 expansion anchor is recommended) for fixing the mounting bracket to the wall (
18 Installing the switch into the 19-inch rack CAUTION: • Ensure a clearance of 1U (44.45 mm, or 1.75 in) between equipment for heat dissipation.
19 Figure 25 Mount the switch to the rack by using front mounting brackets 1231 (1) Front rack posts (2) Switch front panel (3) Front mounting brac
20 Step4 Unpack the load-bearing screws (packed with the rear mounting brackets), and install them to the appropriate positions on the two sides of
21 Figure 27 Mount the switch to the rack by using rear mounting brackets 121 (1) Rack posts (2) Rear mounting bracket CAUTION: Make sure the thin
22 Figure 28 Mount the switch to the rack by using front and rear mounting brackets 1234 (1) Switch rear panel (2) Rear rack post (3) Load-bearing s
23 Figure 29 Mount the switch to the rack by using front and rear mounting brackets 1 23456 (1) Load-bearing screw (2) Rear mounting bracket (3) Swi
Preface The H3C S3100V2 Switch Series Installation Guide guides you through the installation of your switch. It covers product overview, preparing for
24 Figure 30 Install the slide rails Step5 Supporting the switch bottom, slide the switch along the slide rails into the rack until the lower edge
25 During the operation, note the following guidelines: • Make sure that the workbench is flat and sturdy. • Ensure good ventilation and a space of
26 Step3 Insert the expansion anchors into the holes, and remove the hex nut, spring washer, and flat washer from each expansion anchor, as shown in
27 Magnet mounting The S3100V2-8TP-PWR-EI supports magnet mounting. Follow these steps to complete magnet mounting: Step1 As shown in Figure 36, use
28 Grounding the switch CAUTION: • Before using the switch, connect the grounding cable properly to guarantee lightning protection and anti-interf
29 CAUTION: • The supplied grounding cable of the S3100V2 Switch Series does not have an auxiliary OT terminal. • Connect the grounding cable to t
30 part.Connect the made connector to the grounding post of the grounding strip, and then fasten it with a hex nut, as shown in Figure 40. Figure 39
31 CAUTION: Hammer a 0.5 m (1.64 ft) or longer angle iron or steel tube into the earth. The angle iron should have adimension no less than 50 × 50 ×
32 Figure 42 Ground the switch through the PE wire of the AC power supply (1) Three-wire AC power input cable (2) Switch rear panel Connecting the
33 Connecting the AC power cord for an S3100V2-TP-PWR-EI switch The S3100V2-TP-PWR-EI is supplied with a bail latch to secure the AC power cord to th
Symbols Convention Description WARNING An alert that calls attention to important information that if not understood or followed can result in person
34 Figure 46 DC power receptacle +: Chassis ground —: Input voltage range (–47 VDC to –57 VDC) NULL: Reserved Follow these steps to connect the D
35 • All the interface cables are cabled indoors. If there is any cable wired outdoors, verify that socket strip with lightning protection and light
36 Logging in to the switch You can log in only through the console port when you log in to your switch for the first time. Preparations before login
37 RJ-45 Signal DB-9 DB-9 7 DSR 4 DTR 8 CTS 7 RTS Setting up a configuration environment To set up the configuration environment, connect a termina
38 Follow these steps to set terminal parameters: Step1 Select Start > All Programs > Accessories > Communications > HyperTerminal to en
39 Figure 52 Set the serial port parameters Step4 Click OK after setting the serial port parameters and the system enters the following interface.
40 Step5 Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the Settings tab, set the emulation to VT100,
41 CAUTION: • If you log in to the switch through the console port after powering on the switch, no boot information isdisplayed, and you will ente
42 Initially configuring the switch By default, the administrator can only log in to the switch through the console port without any authentication.
43 Connecting the switch to the network NOTE: H3C recommends that you perform basic configuration for your switch before connecting it to the netw
i Contents Product overview···························································································································
44 Installing an SFP transceiver module NOTE: This section only briefly describes the installation and operation guidelines for an SFP transceiver
45 Figure 57 Appearance of an LC connector Follow these steps to connect your switch to the network through optical fibers: Step1 Remove the dust
46 Troubleshooting TIP: Clean your switch periodically because the noncompliant operating environments of switches may causeswitch failures. At the
47 Step2 Check the power supply system. Make sure that the power supply system works properly and outputs a voltage required by the switch. Step3
48 Step3 Check the temperature of the switch. The S3100V2-TP-PWR-EI Switch Series provides the overtemperature protection mechanism. When the intern
49 Appendix A Technical specifications S3100V2-SI Switch Series technical specifications Table 13 S3100V2-SI switches technical specifications Item S
50 Item S3100V2-26TP-SI S3100V2-16TP-SI S3100V2-8TP-SI Chassis leakage current compliance UL60950-1, EN60950-1, IEC60950-1, GB4943 S3100V2-EI Switch
51 Item S3100V2-26TP-EI S3100V2-16TP-EI S3100V2-8TP-EI Relative humidity (noncondensing) 10% to 90% Fire resistance compliance UL60950-1, EN60950-1,
52 Item S3100V2-26TP-PWR-EI S3100V2-16TP-PWR-EI S3100V2-8TP-PWR-EI Total PoE output power 370 W 250 W 125 W Power consumption (minimum hardware an
53 Appendix B Ports and LEDs Ports Console port All S3100V2 switches have one console port on the front panel. Table 17 Console port specifications
ii Powering on the switch·····························································································································
54 10/100/1000Base-T Ethernet port All S3100V2 switches provide 10/100/1000Base-T auto-sensing Ethernet ports on their front panels. Table 19 10/100
55 Category Transceiver module Central wavelength Connector Fiber Max transmission distance SFP-FE-LX-SM1310-BIDI TX: 1310 nm RX: 1550 nm 100 Mbps B
56 Table 22 Power LED on the S3100V2-TP-SI/S3100V2-TP-EI switches LED Status Description Steady green The switch is powered on. Power Off The swit
57 Table 25 Power LED on the S3100V2-TP-PWR-EI switches LED Status Description Steady green The switch is powered on. PWR Off The switch is powere
58 Combo interface LEDs The combo interface LEDs show the presence of link, data transmission status, and port rate of a combo interface. Table 28 C
59 Appendix C Ethernet twisted pair cable Ethernet twisted pair cable An Ethernet twisted pair cable consists of four pairs of insulated wires twiste
60 Table 29 Description on commonly used Ethernet cables Type Description Category 5 Suitable for data transmission at a maximum speed of 100 Mbps, w
61 Figure 61 Crossover cable Crossover cablewhite/orangeorangewhite/greengreenwhite/orangeorangewhite/greenbluewhite/bluegreenwhite/brownbrown1234567
62 10Base-T/100Base-TX 1000Base-T Pin Signal Function Signal Function 3 Tx+ Send data BIDA+ Bi-directional data cable A+ 4 Reserved — BIDD+
63 Index C E G I L P S T V C Connecting the power cord,32 E Ethernet twisted pair cable,59 Examining the installation site,9 G Grounding the switch,
1 Product overview Switch models Table 1 lists the switch models in the H3C S3100V2 Switch Series. Table 1 H3C S3100V2 Switch Series Sub-series Swit
2 Rear panel Figure 2 S3100V2-26TP-SI/S3100V2-26TP-EI rear panel (1) Grounding screw (2) AC-input power receptacle S3100V2-16TP-SI/S3100V2-16TP-EI
3 S3100V2-8TP-SI/S3100V2-8TP-EI Front panel Figure 5 S3100V2-8TP-SI/S3100V2-8TP-EI front panel (1) Speed LED for a 10/100Base-TX Ethernet port (2)
Comentários a estes Manuais