
Installation Manual
H3C SecPath F100-C-EI Firewall
Chapter 3 Installing the Firewall
3-6
(1) Hex nut (2) PGND wire
(3) Bare metal wire (4) Grounding post
(5) Grounding strip
Figure 3-6 Connect PGND wire to grounding strip
Note:
The resistance reading between the firewall chassis and the earth
ground must be less than 5 ohm.
3.4 Connecting the Power Cord
I. AC power supply
AC power input range: 100 to 240 VAC, 50/60Hz
II. AC power source socket
z You are recommended to use a three-wire single-phase
power socket with a neutral point.
Comentários a estes Manuais